Zhengzhou Zhongding Heavy Duty Machine Manufacturing Co., Ltd

Lipu Dedicated to Designing and Manufacturing Ore-dressing and Drying Equipment

Manufacturer from China
Active Member
10 Years
Home / Products / Ore Dressing Plant /

2.2kw Ore Dressing Plant Gold Jigging Machine , Capacity 1-60 T/H

Contact Now
Zhengzhou Zhongding Heavy Duty Machine Manufacturing Co., Ltd
City:zhengzhou
Province/State:henan
Country/Region:china
Contact Person:MrCalvin Cui
Contact Now

2.2kw Ore Dressing Plant Gold Jigging Machine , Capacity 1-60 T/H

Ask Latest Price
Video Channel
Brand Name :Lipu
Model Number :JT1070/2
Certification :ISO9001:2008,CE,IQNet
Place of Origin :China
MOQ :1set
Price :negotiation
Payment Terms :L/C,D/A,D/P,T/T,Western Union,MoneyGram
Supply Ability :90 Set/Sets per Quarter
Delivery Time :30-45 working days after received your payment
Packaging Details :Container
Product Name :Jigging Machine
Model :JT1070/2
Stroke coefficient :0.5
Stroke :0-12mm
Frequency :0-170times/min
Capacity :6-8t/h
Power :2.2kw
Condition :New
Application :Tin, Tungsten, Gold Ore Beneficiation Plant
Color :According to Customer
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Gold Processing Jigging Machine Gravity Separator Capacity 1-60 t/h

Introduction of Gold Jigging Machine

Gold Jigging Machine is a new type gravity separation equipment. It is widely applied in the separation of gold, tin, tungsten, titanium, hematite, coal and other minerals due to its high processing capacity, large range of separation size and simplicity of operation and maintenance.

Working Principle of Gold Jigging Machine

The selected mineral falls onto the screen panel of jig room to form a layer of material. To fill in the water through the sieve and make the beds loose and then the water level lower down (or stop rising). In this process, different density particles transfer, the heavy minerals enter into the lower layer, light minerals come into the upper level, after discharge to get concentrate and tailing.

The improvement is below: move in sawtooth waveform, the water rising fast but lowering down slow, the bed layer is whole up and falls slowly, the effective loose time is long, this whole process can greatly increase the capacity of screen surface units, and save the adding water quantity. The sawtooth wave jig recovery rates can improve Sn: 3.01%, WO3:5.5%, Pb: 1.63%, Zn: 2.04%, the water consumption lowers down 30-75%.

Technical data:

Model

Stroke coefficient

Stroke

(mm)

Frequency

(times/min)

Capacity

(t/h)

Power

(kW)

JT1070/2

0.5

0-12

0-170

6-8

2.2

JT1515/2

0.47

0-25

0-150

20-35

2×4

JT2020/2

0.4

0-20

0-130

40-60

2×5.5

2LTC-366/8T

0.68-0.41

0-50

120-300

3-6

2×1.1

2LTC/6109/8T

0.52-0.35

0-50

120-300

20-30

4×1.5

2LTC-912/4

0.49

0-50

160-280

10-30

11

2LTC-912/4A

0.49

0-100

120-160

20-40

11

LTA55/2

0.5

0-25

250-350

1-5

1.5

LTA1010/2

0.5

0-25

250-350

5-15

3

LTA1515/2

0.5

0-50

200-300

30-50

5.5

LTA2020/2

0.5

0-50

200-300

40-60

7.5

AM-30

0.47

0-50

130-160

10-15

3

LTP34/2

0.58

0-27

280-340

2-6

1.1

Product Picture Show :

2.2kw Ore Dressing Plant Gold Jigging Machine ,  Capacity 1-60 T/H

Inquiry Cart 0